Lifting and Positioning Device

Lifting and positioning device is designed to lift and position any type of 'in process' container or storage bins. This device is mainly used in solid dosage manufacturing and also for liquid compounding operation. This device is designed to achieve dust free transfer of 'In process' enhancing cGMP standard and eliminates laborious manual operation.

Technical Specification :
  • Lifter is designed for capacity of 150 -300KG
  • Lifter arm is made of AISI 304 material
  • Main lifting column is made of MS structure and externally claded by SS 304 material with front side covered with PVC bell to prevent powder entering the column area.
  • Floor and coding swivel bearing units are completely enclosed with SS 304 Material.
  • Hydraulic lifting arrangement comprised of double acting hydraulic cylinder, actuated by gear pump through directional control valve.

  • Power Pack -The electro hydraulic power pack consist of reservoir oil level indicator,filter breather,suction stainer, gear pump and electric motor
  • Operation Safety -To have safe operation to protect man and machine our lifting unit is provided with various protective arrangements such as non return valve, which prevents litfer coming down incase of hose failure .
  • Bin up position locking arrangement be given by means of special stopper arrangement on request.

  • . No Chance of any kind of segregation happening during transfer of blend

  • Gross Weight - 600Kg

  • Net Weight-450Kg

Tipper

This equipment is most useful to transfer the material from container of FLUID BED DRYER to INTERMEDIATE PRODUCT CONTAINER With help of this equipment cut tree and very speedy material transfer from FBD bowl is possible. The equipment is equipped with one cone type container which is provided with damping hooks to clamp the FBD bowl, rubber gasket for air tight fitting between FBD bowl and cone type container The container is also have a butterfly valve at bottom to drain the material in required IPC or any other container The Hydraulic system (power pack unit with cylinder) is provided to the complete assembly with FBD bowied tilt the pair of cone type container and FBD bowl 180 degree.

With help of the hooks first clamp the FBD bow with cone type container. Lift the whole assembly with FBO bowl at a desirable height. With help of hydro mechanical system tilt the Whole assembly at 180 degree. Finally all the material which was in the FBO bowl is transfer in cone container Discharge the material in IPC or any other hopper, with pal butterfly valve which is provided discharge of cone type container.